High Speed Line Madrid – Barcelona
Twin structures.
Open deck type 4-span continuous trough girder bridge.
Deck construction system: Launching.
Maximum span: 46 m.
Opening:
December, 2007
Contractor:
CORSAN – CORVIAM
Owner:
ADIF (Administrador de Infraestructura Ferroviarias)