Aqueducts Sastago Channel


Los Monegros (Zaragoza)

Two aqueducts. Lengths: 585 and 407 m.
Spans: 29,70 m.
Deck: Post-tensioned concrete girder.
Deck : Step construction method by scaffolding.

Date:
1994

Contractor:
FERROVIAL

Owner:
Spanish Ministry of Public Works.
Confederación Hodrográfica del Ebro.

Technical articles:
Acueductos Val de la Olivera y barranco del Reguero, pertenecientes al canal de Sástago (Los Monegros)