Deck: Extradossed post-tensionned concrete girder.
Running in a curve, the bridge has a succession of spans measuring 42.00 +66.00 + 42.00 m, crosses a railway line, the river Deba and a road.
- Projet Nominee for 2006 FIB awards
Opening Highway:
December, 2003
Contractor:
U.T.E.:Const. Galdiano, Moyúa, Murías, Altuna and Uría.
Owner:
Diputación Foral de Gipuzkoa.
Technical articles:
- Puente extradosado sobre el río Deba (autopista Vitoria-Gasteiz, Eibar)
Extradosed Bridge over the river Deba (Vitoria-Gasteiz – Eibar Motorway)
HyA 231 (2004, trimestre 1)
http://e-ache.com/modules/hormigonyacero/pdf.php?id=231
- Puente sobre el río Deba (Autopista Vitoria – Eibar)
Bridge over the River Deba (Vitoria – Eibar Motorway)
http://ropdigital.ciccp.es/detalle_articulo.php?registro=18463&anio=2005&numero_revista=3459