Istmo Viaduct on Contreras Reservoir


High Speed Line Madrid – Valencia

Overall Length: 830 m.
Maximum span: 66 m.
Maximim Height: 70 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Step-by-step on scaffolding.

Opening:
Diciembre 2010.

Contractor:
U.T.E. AZVI-SAN JOSÉ

Owner:
ADIF (Administración de Infraestructuras Ferroviarias)