Main span, over the Highway: 42,50 m.
Deck: Post-tensioned concrete slab.
Depth of deck: Variable from 0,60 to 1,90 m.
Construction method deck: Cast in situ on centering.
Date:
1994
Contractor:
FCC
Owner:
Spanish Ministry of Fomento
Technical articles
– Hormigón y acero. Number 214 (4th Quarter 1999)
Pedestrian Bridge, at Alicante – Spain (José Antonio Llombart and Jordi Revoltós)