Pedestrian Bridge, at Alicante


Main span, over the Highway: 42,50 m.
Deck: Post-tensioned concrete slab.
Depth of deck: Variable from 0,60 to 1,90 m.
Construction method deck: Cast in situ on centering.

Date:
1994

Contractor:
FCC

Owner:
Spanish Ministry of Fomento