Limassol – Pafos Highway
Twin structures.
Total length 422,60 divided into 8 spans (45.25 + 6 x 55.35 + 45.25 m ).
Maximum pier height: 60 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Incremental launching.
Construction method piers: climbing formworks.
Date:
2000-2002
Contractor:
China Wanbao Eng. Corp., Beijing
Owner:
Republic of Cyprus
Public Works Department