Section Requejo – Villavieja
4 Viaducts.
Maximum Span: 40 m.
Maximum pier height: 65 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Step by step using movable scaffold.
Construction method piers: climbing forms.
Date:
1996-1997
Contractor:
NECSO – ACS
Owner:
Spanish Ministry of Fomento
Visited 555 times, 1 visit(s) today

