Viaducts in the High-Speed Railway between Madrid and Seville
Sant Bartomeu Viaduct
Vic, Barcelona (Highway Lleida-Girona)
Spans: 50.70 m.
Maximum pier height: 48 m.
Deck: Post-tensioned concrete box girder.
Deck with external post-tensioning.
Construction method deck: Incremental launching.
Date:
1995-1996
Contractor:
OSSHA-COMAPA-LAIN
Owner:
GISA
Technical articles: