Calatayud - Ricla Viaducts


High-Speed Railway Madrid – Barcelona

Overall length: 295 and 250 m.
Maximum span: 45 m.
Maximum pier height: 40 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Incremental launching.
Construction method piers: slip forms.

Viaducts over River River Aranda and Jalón
1998-1999

Contractor:
DRAGADOS – VIAS Y CONSTRUCCIONES

Owner:
GIF (Gestor de Infraestructuras Ferroviarias)