High-Speed Railway Madrid – Barcelona
Overall length: 295 and 250 m.
Maximum span: 45 m.
Maximum pier height: 40 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Incremental launching.
Construction method piers: slip forms.
Viaducts over River River Aranda and Jalón
1998-1999
Contractor:
DRAGADOS – VIAS Y CONSTRUCCIONES
Owner:
GIF (Gestor de Infraestructuras Ferroviarias)