Structure made of two twin bridges.
Overall length of each one: 206,40 m.
Spans: 46,44 – 51,60 – 51,60 – 46,44 m.
Deck: Post-tensioned concrete girder.
Construction method deck: Step by step using a movable scaffold.
Irán
Línea Teherán – Karaj
18/12/2002
Contractor:
Shaloudeh
Technical articles:
Puente de ferrocarril en Teherán (Irán). Railway bridge at Tehran (Iran)