Botijas Bridge (Mexico)


Durango – Mazatlan Highway

Deck: Post- tensioned box girder, built by cantilever system.
Main span: 165 m.
Height: 80 m.

Date:
2011-2012

Contractor:
ALDESEM

Owner:
Secretaria de Comunicaciones y Transportes
Direccion General de Carreteras

Visited 858 times, 1 visit(s) today