Highway Vitoria – Gasteiz – Eibar
Double Viaduct.
Deck: Post-tensioned box girder, built by cantilever system.
Openinig Highway:
December, 2003
Contractor:
FCC – NECSO
Owner:
Diputación Foral de Gipuzkoa
Visited 302 times, 1 visit(s) today

Highway Vitoria – Gasteiz – Eibar
Double Viaduct.
Deck: Post-tensioned box girder, built by cantilever system.
Openinig Highway:
December, 2003
Contractor:
FCC – NECSO
Owner:
Diputación Foral de Gipuzkoa