Lerida - Martorell Viaducts


High-Speed Railway Madrid- Barcelona, Stretch VII-A

2 Viaducts.
Maximum span: 46 m.
Deck: Post-tensioned concrete box girder.
Construction method deck:Step-by-step on scaffolding.
Schock transmitters between abutments and deck.

Date:
2003

Contractor:
COPCISA

Owner:
GIF (Gestor de Infraestructuras Ferroviarias).

Visited 284 times, 1 visit(s) today