High-Speed Railway Madrid- Barcelona, Stretch VII-A
2 Viaducts.
Maximum span: 46 m.
Deck: Post-tensioned concrete box girder.
Construction method deck:Step-by-step on scaffolding.
Schock transmitters between abutments and deck.
Date:
2003
Contractor:
COPCISA
Owner:
GIF (Gestor de Infraestructuras Ferroviarias).
Visited 284 times, 1 visit(s) today

