Construction Project of Contreras Viaduct


High Speed Line Madrid – Valencia

Overall Length: 587 m.
Solid ribbed deck arch bridge.
Concrete arch span: 261 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Step-by-step on scaffolding.
Maximum deck span: 43.50 m.

Original Design:
J. Manterola (Carlos Fernández Casado S.L.)

Opening:
December 2010

Contractor:
U.T.E. AZVI-SAN JOSÉ

Owner:
ADIF (Administración de Infraestructuras Ferroviarias)

Visited 631 times, 1 visit(s) today