High Speed Line Madrid – Valencia
Overall Length: 587 m.
Solid ribbed deck arch bridge.
Concrete arch span: 261 m.
Deck: Post-tensioned concrete box girder.
Construction method deck: Step-by-step on scaffolding.
Maximum deck span: 43.50 m.
Original Design:
J. Manterola (Carlos Fernández Casado S.L.)
Opening:
December 2010
Contractor:
U.T.E. AZVI-SAN JOSÉ
Owner:
ADIF (Administración de Infraestructuras Ferroviarias)
Visited 631 times, 1 visit(s) today

