Three-span composite structure steel-concrete.
Deck width: 22,30 m.
Main span: 57 m.
Special construction: Launching the two half deck from both margins of the river.
Date:
2001-2002
Technical articles
– Revista de Obras Públicas. Number 3.431. March, 2003
Contractor:
CORSAN-CORVIAM
Owner:
Junta de Castilla León.
Technical articles:
Visited 390 times, 1 visit(s) today

