Argos Bridge, at Medellin (Colombia)


Urban Viaduct

Deck: Continuous post-tensioned concrete slab.
Construction step by step on a scaffolding.

Date:
1988

Contractor:
ENTRECANALES, CONSTRUCCIONES Y CONTRATAS, DICKERHOFF UND WIDMAN

Owner:
METROMED

Visited 505 times, 1 visit(s) today