Palleja Overpasses (Barcelona)


Three-span composite structures steel-concrete

Spans:
32,20 – 39,00 – 30,00 m.
32,80 – 39,60 – 32,80 m.

Curvature radius : 90 m.

2 Overpasses on the Baix Llobregat Highway (Barcelona)

Date:
2002 – 2003

Contractor:
DRAGADOS – FERROVIAL – NECSO

Owner:
Spanish Ministry of Public Works